Feishu Work Review Timemachine#
Overview#
Create a compact, high-signal review of a user's recent work from Feishu materials. Focus on what the user actually drove or owned, not everything discussed in meetings.
Workflow#
1. Define scope first#
Clarify or infer:
- time range: last week / last month / specific dates
- output form: concise recap / weekly breakdown / monthly summary / boss-facing version
- destination: chat reply only, or create/update a Feishu doc
If the user already gave a clear scope, do not ask again.
2. Gather source materials from Feishu#
Prefer this order:
- Search the user's recent docs/wiki nodes
- Prioritize docs created by or owned by the user
- Read key docs in full only when needed
- Prefer summaries / structured notes first, then raw transcript docs for validation
Useful source types:
- meeting notes and transcripts
- work-in-progress docs
- project plans
- technical方案 / design docs
- quality / metrics docs
- wiki pages tied to ongoing initiatives
Do not try to read everything. Read enough to identify repeated themes and evidence of ownership.
3. Separate real work from meeting noise#
Do not treat every meeting mention as the user's work.
Use these signals to infer stronger ownership:
- the user is the doc owner / creator / primary editor
- the user is the main speaker framing goals, tradeoffs, or next steps
- action items are explicitly assigned to the user
- the user is pushing the plan, organizing follow-up, or coordinating POCs
- the same initiative appears across multiple docs with the user in a central role
Treat these as weaker signals:
- the user merely attended the meeting
- another person's project status appears in notes
- broad team discussion without assigned ownership
- AI-generated meeting summary claims not supported elsewhere
When uncertain, downshift wording:
- use “参与推动 / 协同推进 / 讨论并判断”
- avoid overstating as “主导完成”
Compress the material into a few workstreams, usually 3-5:
- platform / product / project track
- AI / efficiency / technical exploration track
- metrics / governance / methodology track
- cross-team coordination track
For each workstream, capture only:
- what changed
- what the user specifically drove
- why it mattered
Delete or skip:
- optional commentary
- long caveats
- repeated explanations
- every subtask from meeting minutes
- alternate interpretations unless the user asked for analysis
5. Write in layers#
Default output order:
- one-paragraph core conclusion
- 3-5 core workstreams
- weekly breakdown if requested
- one-sentence summary
If the user says “keep only the core”, reduce to:
- core conclusion
- core workstreams
- optional one-line weekly view
Output pattern#
Compact monthly review#
Use this structure:
markdown
# 时光机回顾|过去一月主要工作总结
## 核心结论
[1 short paragraph]
## 核心主线
### 1. [主线]
- [核心动作]
- [核心动作]
### 2. [主线]
- [核心动作]
## 按周回顾
### 第 1 周:[关键词]
[1-3 lines]
### 第 2 周:[关键词]
[1-3 lines]
## 一句话总结
[1 sentence]
Boss-facing version#
Make it shorter and more outcome-oriented:
- progress
- scope / influence
- cross-team traction
- next-step signal
Avoid process-heavy wording.
Feishu doc creation/update#
When the user asks to create or write a Feishu doc:
- create the doc once a solid draft exists
- if permissions block the action, tell the user to complete the authorization card and then resume
- once created, prefer overwriting the draft if the user asks to simplify aggressively
- when refining, keep the same doc unless the user asks for a new one
Style rules#
- Write in concise Chinese unless the user asks otherwise
- Prefer short sections over long prose
- Remove “可选项” and hedging text unless uncertainty is material
- Use strong verbs for high-confidence ownership, softer verbs for medium-confidence involvement
- Default to fewer bullets, not more
- Keep the final document skimmable in under 1-2 minutes unless the user asked for depth
Anti-patterns#
Do not:
- dump a list of all meetings
- copy AI meeting summaries verbatim
- equate attendance with ownership
- preserve every nuance when the user wants a crisp recap
- keep “next-step suggestions” if the user asked for a finished summary
Final check#
Before delivering, verify:
- Is this mostly about the user's actual work, not everyone else's?
- Did I collapse repeated themes into a few clear workstreams?
- If asked to simplify, did I remove optional sections rather than just shorten sentences?
- Would the user immediately recognize this as accurate and useful?